backlog
英 [ˈbæklɒɡ]
美 [ˈbæklɔːɡ]
n. 积压的工作
vt. (使)积压; 储存
复数:backlogs 过去分词:backlogged 现在分词:backlogging 过去式:backlogged 第三人称单数:backlogs
Collins.1 / BNC.14585 / COCA.14476
牛津词典
noun
- 积压的工作
a quantity of work that should have been done already, but has not yet been done
柯林斯词典
- N-COUNT 积压的事情;未完成的工作
Abacklogis a number of things which have not yet been done but which need to be done.- There is a backlog of repairs and maintenance in schools.
对各学校的修缮和维护工作积压了一堆。
- There is a backlog of repairs and maintenance in schools.
英英释义
noun
- an accumulation of jobs not done or materials not processed that are yet to be dealt with (especially unfilled customer orders for products or services)
- something kept back or saved for future use or a special purpose
- the large log at the back of a hearth fire
verb
- accumulate and create a backlog
双语例句
- This backlog has been worked through the system and suppliers in this sector are anticipating a difficult time ahead.
这些积压的订单已经完成,这个行业的系统和供应商预计未来将是一段艰难的日子。 - Discovering and describing product backlog items is an ongoing process.
识别和描述产品待办事项列表中的待办项是一个持续的过程。 - When using agile to manage a project you will want to define a project and a product backlog.
用敏捷方式管理项目时,你会定义项目backlog和产品backlog。 - This is a waste of valuable transmission and processing bandwidth and can cause an unacceptable replication backlog to develop.
这是一个对宝贵的传输和处理带宽的浪费并且可能导致发展出不可接受的复制日志的积压。 - This enables them to spot possible improvements and inconsistencies in the features on the product backlog.
这可以让他们发现产品Backlog中特性里的潜在改进和不一致。 - During the sprint, the status of the work items in the Sprint Backlog is updated daily.
在冲刺期间,SprintBacklog中工作项目的状态每日都会得到更新。 - When I returned from maternity leave, there was a backlog of work waiting for me.
是积压的邮件。我休产假回来上班后,有一大堆工作等着我做,可以说。 - There is a backlog of repair and maintenance work to be done in our apartment.
我们的公寓堆积了一些待修理及维修的事项。 - Such changes and any missing or incorrect functionality were added to the product backlog for the next sprint.
这些修改和任何缺失的或错误的功能都添加到下一次sprint的产品待办事项中。 - Some teams estimate the size of all of the items in their backlog prior to any development.
有些团队在任何开发之前都要对他们积压中所有条目的大小进行评估。